Naval Medical Center HVAC Upgrade Phase I

Davenergy provided healthcare construction management services at the 1.0 million square foot main hospital at the Naval Medical Center San Diego (NMCSD). The existing hospital HVAC system, originally constructed in 1987, had deteriorated and was not meeting current requirements. Services included design consulting, constructability reviews and construction management for infection control, temporary air, construction phasing, […]

Naval Medical Center San Diego Post Construction Award Support

Davenergy provided a full time Construction Scheduler who developed and maintained an effective construction scheduling program that coordinated phasing and construction sequencing with the Naval Medical Center facilities staff, medical staff and various contractors working in the hospital to optimally program and deconflict several dozen ongoing construction projects. Davenergy’s scope of work consisted of contractor […]

Naval Medical Center San Diego Construction Management & Engineering Support

Davenergy provides full-time Owners Rep healthcare construction management and engineering consulting, as well as Utility Outage coordination, Energy Management System monitoring, and Inventory Management for all facilities maintained by Naval Medical Center San Diego (NMCSD) totaling over 2.2 million square feet of healthcare, administrative and clinical spaces. Scope includes the development of Owner’s Project Requirements, […]

VISN 21 Palo Alto Construction Management Services

The major projects supported Research/Veterinary Facility ($98M), Radiology Consolidation Project ($121M), and Recreation Services Building ($21.3M) are described below and were completed at the end of October 2021. The capital asset improvements program effort includes the construction of the Research/Veterinary Medical Unit, a 95,000-SF, 2-Story building with a below grade Vivarium floor, interstitial floor, and […]

VA Sierra Nevada Health Care System Employee Engagement HVAC Chilled Beam Utility Upgrade

Davenergy was contracted to provide engineering design for the cooling and heating in Building 1A’s chilled beam system. This design effort addressed the increased heating, electrical, and data requirements on the 3rd floor. Energy efficiency, and occupancy comfort was achieved because our key staff understood the nuances and expertise required when upgrading building systems. Davenergy […]