Davenergy was contracted to provide 35% design development (bridging documents) to replace and upsize the existing 400-amp feeders and to re-balance loads on the North and South substations to support planned future construction. Our design staff maintained close coordination with the City of Palo Alto Utility (CPAU) department. Extensive permitting with the CPAU and other local municipalities was required, as was coordination to address traffic management issues during potholing.
Major tasks of this electrical upgrade project were to: